Get a Quote

RESOURCES / PRACTICAL GUIDE

Prepare a consistent BOM & placement package

Connect purchasing information, placement data and assembly intent without leaving variant decisions to guesswork.

← All resources

General preparation guidance. Company-specific file acceptance, processes and capabilities require confirmation / 待确认.

STEP 01

Make the BOM actionable

Use a structured spreadsheet or CSV. Identify each line with reference designators, quantity, description or value, footprint, manufacturer and full manufacturer part number where specified. Separate an approved alternative from a supplier suggestion. State the quantity basis, such as one assembly, and identify customer-supplied items so purchasing responsibilities are clear.

STEP 02

Control variants and unpopulated parts

State the assembly variant and revision. Mark do-not-populate items explicitly and keep those decisions consistent across the BOM, placement output and drawings. Review repeated designators, missing references and lines whose stated quantity differs from the listed references. If several variants share one bare board, provide a clear per-variant population definition.

STEP 03

Document coordinate conventions

A placement file should identify the component reference, X and Y position, side and rotation. Record its units, origin and rotation convention. Exporter options may change origin or bottom-side treatment, so supply the export settings or an explanatory note and agree how the receiving team will interpret the file.

STEP 04

Reconcile the three views

Compare the BOM references with the placement data and assembly drawing. Explain intentional differences such as hand-fitted parts or mechanical items. Include orientation and polarity information for ambiguous parts. A review of a few asymmetric components and bottom-side parts is useful when confirming how the placement data will be interpreted.

STEP 05

Define sourcing and test responsibilities

Identify full turnkey, customer-supplied or mixed sourcing. State whether substitutions require written approval and how shortages should be handled. Attach assembly notes and any test instructions, connector pinout or fixture information needed for a meaningful review. Accepted file formats, package support and actual inspection methods must be confirmed with the company.

BEFORE HANDOVER

Final checklist

  • BOM and placement outputs reference the same revision and variant.
  • Part numbers, references, quantity basis and sourcing ownership are clear.
  • Units, origin, side and rotation conventions are documented.
  • Assembly drawings explain polarity, DNP items and special instructions.
Prepare your local inquiry preview ↗

Continue preparing

Preparing your PCB & PCBA RFQ ↗Gerber submission: check the complete package ↗Before you release a board design ↗

LET’S BUILD WHAT’S NEXT

Your next board starts
with a conversation.

Bring your requirements. Identify what needs engineering review.

Get a Quote